The first announcement on environmental impact assessment of energy conservation and environmental protection comprehensive upgrading project

Column:Corporate News Time:2016-07-14 Browsing volume: 388

Energy saving and environmental protection comprehensive upgrading project of Shandong Dongjia Group Co., Ltd

The first announcement of environmental impact assessment

According to the requirements of the Interim Measures for Public Participation in Environmental Impact Assessment (HF [2006] No. 28) and the Notice on Strengthening the Supervision and Management of Public Participation in Environmental Impact Assessment of Construction Projects (LHPH [2012] No. 138), the following announcements are hereby issued:

1、 Name and outline of the construction project:

Project name: Energy saving and environmental protection comprehensive upgrading project

Employer: Shandong Dongjia Group Co., Ltd

Construction site: Shandong Dongjia Group Co., Ltd., No. 55, Qiugu Hengli River, Boshan District, Zibo City

Main construction contents:

The project is an energy conservation and environmental protection upgrading project. The main construction content is to upgrade the washing process in the water washing section from plate and frame washing to membrane washing, so as to save primary water consumption and reduce wastewater discharge; Dismantle 1 # and 2 # old calcining kilns, 3 # as a test kiln, replace it with a 4-meter diameter energy-saving and environment-friendly calcining kiln, and provide efficient venturi, water scrubbing tower, electric demister, and alkali scrubbing tower environmental protection facilities. Dismantle the original 35m chimney, build a new 60m kiln chimney, reduce the emission of waste gas pollutants, and achieve environmental upgrading; Replace the double effect concentration system in the concentration process, the filter press in the salt treatment process, and the large high-efficiency flash evaporation equipment in the drying process to reduce the steam consumption and achieve energy saving upgrading; The hydrolysis process is upgraded to adding crystal seeds, the bleaching process is replaced by a large bleaching tank, the crushing process is replaced by an imported Raymond mill, the wet grinding process is replaced by an efficient sand mill, and the chemical treatment process is upgraded to a new coating process. With the same capacity, the product quality is upgraded and the product structure is optimized.

The project belongs to the encouraged category in the Guiding Catalogue of Industrial Restructuring (2011 Edition) (Revised), which conforms to the national industrial policy.

2、 Name and contact information of the construction unit

Employer: Shandong Dongjia Group Co., Ltd

Address: Shandong Dongjia Group Co., Ltd., No. 55, Qiugu Hengli River, Boshan District, Zibo City

Contact: Manager Sun Tel: 0533-4167711 Postal code: 255200

3、 Introduction to the evaluation organization undertaking the environmental impact assessment

Environmental impact assessment unit: Shandong Haimeinong Project Consulting Co., Ltd

Certificate No.: GHPZ No. 2452; Industry scope: light industry, textile, chemical fiber, chemical, petrochemical and pharmaceutical industry, metallurgy, electromechanical industry, building materials, thermal power, social areas, general project environmental impact report, special project environmental impact report, etc.

Address: Fengrun Building, No. 100, South Industrial Road, Jinan Post code: 250100

Contact: Manager Han Tel.: 0531-81795815 Fax: 0531-81795818 ext. 8100

4、 Working procedures and main work contents of environmental impact assessment

(1) The environmental impact assessment process of the Project is as follows, and the flow chart is shown in Figure 1:

① According to the national "Directory of Classified Management of Environmental Protection of Construction Projects", it is determined that the project should prepare an environmental impact report.

② Study the national and local laws, regulations and standard documents related to environmental protection, and study the technical documents and other documents related to the construction project; Conduct preliminary environmental survey and preliminary engineering analysis.

③ Identify environmental impact factors and screen assessment factors to determine the assessment priorities.

④ The work grade of each individual environmental impact assessment is determined on the basis of environmental status survey and preliminary engineering analysis of the Project.

⑤ Use the current monitoring data to analyze the impact of the whole plant on the environment.

⑥ Evaluate the environmental impact of the construction project according to national and local laws, regulations and standards.

⑦ On the basis of public participation in the survey, the evaluation conclusion on the environmental feasibility of the construction project is given; Put forward environmental protection measures and suggestions and complete the preparation of the report.

(2) Main contents of EIA:

① Engineering analysis.

② Investigation and assessment of environmental status.

③ Identification of environmental impact, screening of assessment factors and determination of assessment grade.

④ Environmental impact analysis, prediction and assessment.

⑤ Environmental protection measures and their technical and economic demonstration.

⑥ Analyze the economic profit and loss of the environmental protection measures of the proposed project.

⑦ Conduct public participation survey.

⑧ Prepare environmental monitoring and management plan.

⑨ From the perspective of environmental protection, give the exact conclusion whether the project can continue to be constructed and operated.

5、 Main issues for public comments

We hope to get your attitude towards the project construction, your views on the positive and negative impacts of the construction project, your most concerned issues, your wishes and requirements, etc.

6、 Main ways of public opinions

If the public has any opinion on the environmental protection of the construction project, they can submit it to Shandong Dongjia Group Co., Ltd. or Shandong Haimeinong Project Consulting Co., Ltd. within 10 working days from the date of this announcement. The feedback method can be telephone, fax or e-mail.

Shandong Dongjia Group Co., Ltd

July 14, 2016


主站蜘蛛池模板: 女人18片毛片60分钟| 人妻激情另类乱人伦人妻| 久久国产精品波多野结衣av| 伊在人天堂亚洲香蕉精品区| 国产av日韩a∨亚洲av电影| 又爽又黄又无遮挡网站动态图| 免费超爽大片黄| 国产av无码专区亚洲awww| 中文字幕亚洲无线码在线一区| 欧美阿v高清资源在线| 久久人人爽人人爽人人av| 亚洲欧洲免费无码| 国产精品十八禁在线观看| 视频一区视频二区制服丝袜| 中文精品一卡2卡3卡4卡葡京 | 特级精品毛片免费观看| _97夜夜澡人人爽人人喊_欧美| 一本大道加勒比久久综合| 亚洲乱亚洲乱妇无码| 亚洲av无码专区在线播放中文| 一区二区三区中文字幕| 天天躁日日躁狠狠躁av中文| 日韩精品专区在线影院重磅| 青春草在线视频免费观看| 亚洲熟妇色自偷自拍另类| 白丝兔女郎m开腿sm调教室| 亚洲欧洲无码av电影在线观看 | 18禁裸男晨勃露j毛免费观看| 久久久婷婷五月亚洲97号色| 最近中文2019字幕第二页| 八戒网站免费观看视频| 天天爽天天爽夜夜爽毛片| 日韩乱码人妻无码中文字幕视频| 无码熟妇人妻av| 男女性高爱潮免费网站| √最新版天堂资源在线| 妺妺窝人体色777777| 久久久久久国产精品美女| 亚洲综合色无码| 五十路熟女俱乐部| 伊人涩涩涩涩久久久av|