The Second Announcement on Environmental Impact Assessment of Energy Conservation and Environmental Protection Comprehensive Upgrading Project

Column:Corporate News Time:2016-08-15 Browsing volume: 395

Energy saving and environmental protection comprehensive upgrading project of Shandong Dongjia Group Co., Ltd

The Second Announcement of Environmental Impact Assessment

The environmental impact report of the energy conservation and environmental protection comprehensive upgrading project of Shandong Dongjia Group Co., Ltd. has been basically prepared according to the Environmental Impact Assessment Law of the People's Republic of China, the Interim Measures for Public Participation in Environmental Impact Assessment (HF [2006] No. 28) The Notice of Shandong Provincial Environmental Protection Department on Strengthening Public Participation in the Supervision and Management of Environmental Impact Assessment of Construction Projects (LHPH [2012] No. 138) and other relevant regulations on environmental impact assessment will publicize the construction of the proposed project and the relevant contents of environmental impact assessment, so as to widely understand the public's attitude towards the proposed project and the opinions and suggestions on environmental protection, and accept the supervision of the public. The relevant information of the proposed project is publicized as follows:

1、 Overview of the construction project

Project name: Energy Conservation and Environmental Protection Comprehensive Upgrading Project of Shandong Dongjia Group Co., Ltd

Project overview: The proposed project will upgrade the existing 60000 t/a titanium dioxide production line in the plant for energy conservation and environmental protection. The main construction content is to upgrade the washing process in the water washing section from plate frame washing to membrane washing, so as to save the primary water consumption and reduce the wastewater discharge; Dismantle 1 # and 2 # old calcining kilns, 3 # as a test kiln, replace it with a 4-meter diameter energy-saving and environment-friendly calcining kiln, and provide efficient venturi, water scrubbing tower, electric demister, and alkali scrubbing tower environmental protection facilities. Dismantle the original 35m chimney, build a new 60m kiln chimney, reduce the emission of waste gas pollutants, and achieve environmental upgrading; Replace the double effect concentration system in the concentration process, the filter press in the salt treatment process, and the large high-efficiency flash evaporation equipment in the drying process to reduce the steam consumption and achieve energy saving upgrading; The hydrolysis process is upgraded to adding crystal seeds, the bleaching process is replaced by a large bleaching tank, the crushing process is replaced by an imported Raymond mill, the wet grinding process is replaced by an efficient sand mill, and the chemical treatment process is upgraded to a new coating process. With the same capacity, the product quality is upgraded and the product structure is optimized.

The Guiding Catalogue for Industrial Restructuring (2011 Edition) (revised) is divided into encouraged, restricted and eliminated categories. The proposed project belongs to "23. Technology development, application and equipment manufacturing of energy conservation, water conservation, material conservation and environmental protection, and comprehensive utilization of resources" in the "38 Encouraged Categories of Environmental Protection and Resource Conservation and Comprehensive Utilization". The project construction conforms to the national industrial policy.

2、 Overview of the possible impact of the construction project on the environment

1. Exhaust gas

① Waste gas from rotary kiln calcination

The calcination tail gas is mainly the flue gas produced by the calcination kiln. The characteristics of the waste gas are that it has a certain temperature, a large moisture content, sulfuric acid mist, sulfur oxides, titanium dioxide particles, water vapor, etc., and the emission rate is relatively uniform.

The calcined tail gas first passes through the settling chamber to remove most of the particulate dust through inertial and gravity sedimentation, and then enters the Venturi scrubber to turn part of SO3 into acid mist. The dust will condense into large particles after being wet with water, and then be discharged into the recovery pool with water. The waste gas will then pass through the alkali spray tower to remove SO2 and acid mist. The temperature will drop below 50 ℃ at the same time, and then enter the electric demister. Under the effect of high-voltage electrostatic field, The acid mist, most SO2 gas and a small amount of dust are removed, and the tail gas meeting the emission standard is discharged overhead through an exhaust funnel with a height of 60 meters and a diameter of 2.5 meters.

② Dusty tail gas of process unit

The dusty tail gas of the process unit mainly includes titanium dioxide powder and the tail gas containing titanium dioxide particles in the packaging process. The above dusty tail gas is dedusted by adding pulse bag filter at the outlet. After the treatment reaches the standard, it is discharged at high altitude through a 25-30m high exhaust funnel.

③ Dry tail gas

The washed TiO2 was dried with a rotary flash dryer. The waste gas generated in this process is mainly TiO2 dust, which is discharged through two 35m high exhaust funnels after being treated by pulse bag filter.

(2) Waste acid

The waste acid produced in the production process is mainly the waste acid produced by the hydrolysis slurry after the plate and frame filtration. The acid content is about 18% to 25%, and contains ferrous ions, titanium dioxide suspended solids and other impurities.

The waste acid produced in the primary water washing process contains 20-23% sulfuric acid. After the calcination tail gas is preconcentrated to 30%, part of the waste acid is directly returned to the acidolysis process for acid preparation or leaching, which is used to adjust the acidity coefficient of the titanium solution, but its amount only accounts for 20% of the total emissions; The remaining waste acid enters the renewable resource workshop of Dongjia Group through the pipeline for the production of polymeric ferric sulfate.

(3) Wastewater

The acid wastewater generated in the project includes acid hydrolysis tail gas washing water, calcination tail gas washing water, primary water washing wastewater, vacuum crystallization tank washing water, filter press washing water, evaporator washing water, and waste acid treatment filter cloth washing water. The acid wastewater generated every day is discharged into the sewage treatment station for treatment, and the domestic sewage is discharged into the municipal sewage pipe network after being treated in the sewage treatment station.

(4) Solid waste

The waste residue discharged from the retrofitted plant is mainly the green alum from the black area separation process, which can be sold as a by-product.

The solid waste of the project is mainly the red gypsum discharged from the sewage treatment station and the domestic garbage of the staff, and the red gypsum is stacked in the special slag yard of the company. Domestic garbage shall be disposed of uniformly by the environmental sanitation department.

(5) Noise

The main noise pollution of the Project mainly comes from furnace house, ball mill, Raymond machine, etc.

(6) Main environmental protection facilities

Table 1 List of Main Environmental Protection Facilities

3、 Main conclusions of the EIA report

The energy conservation and environmental protection comprehensive upgrading project of Shandong Dongjia Group Co., Ltd. meets the requirements of national industrial policies; After implementing various pollution control measures, the proposed project meets the local environmental function requirements; Meet the requirements of cleaner production and circular economy; From the perspective of environmental protection, the project construction is feasible after fully implementing the pollution prevention measures proposed in the report.

4、 Method and deadline for consulting the EIA compendium of the project

Within 10 working days from the date of announcement (August 15 to August 26, 2016), Shandong Dongjia Group Co., Ltd. (contact: Sun Yanjin 18615338099) and Shandong Haimeinong Project Consulting Co., Ltd. (contact: Zhang Yanli 0531-81795815 to 8011, e-mail jn1605@126.com )The public will be provided with query and reference services for the simplified version of the report.

If the public has environmental protection opinions on the construction project, they can submit them to Shandong Dongjia Group Co., Ltd. and Shandong Haimeinong Project Consulting Co., Ltd. at the same time within 10 working days from the date of this announcement, or send their written opinions to the environmental protection administrative department responsible for the approval of the construction project.

Issued by: Shandong Dongjia Group Co., Ltd

Announcement time: August 15, 2016


主站蜘蛛池模板: 国产精品 视频一区 二区三区| 国产免费无码一区二区三区 | 99精品欧美一区二区三区| 亚洲va中文字幕| 在线播放亚洲第一字幕| 国精产品一区二区三区| 风间由美性色一区二区三区| 亚洲av伊人久久青青草原| 亚洲国产一成人久久精品| 人人摸人人操| 大胆人gogo888体艺术摄影| 亚洲人成影院在线观看| 国产又色又爽又黄的在线观看| 精品97国产免费人成视频| 欧美 国产 综合 欧美 视频| 第一次处破女18分钟高清| 一本一道波多野结衣av中文| 国产sm重味一区二区三区| 久久无码精品一区二区三区| 亚洲av永久无码精品放毛片| 奇米影视7777久久精品| 久久精品99久久香蕉国产色戒| 国产亚洲日韩欧美另类第八页| 一区二区三区国产| 色综合色狠狠天天综合色| 日日摸日日碰人妻无码老牲| 五十丰满熟妇性旺盛| 亚洲av日韩av欧v在线天堂| 人妻少妇边接电话边娇喘| 亚洲av永久无码精品国产精品| 最近新免费韩国视频资源| 国产精品亚洲日韩欧美色窝窝色欲 | 亚洲国产午夜精品理论片妓女| 樱桃视频影院在线播放| 久久久久亚洲av无码专区电影| 欧美高清精品一区二区| 无码乱人伦一区二区亚洲一| 亚洲国产精品无码久久青草| 高潮喷水在线| 一个人看的www片免费高清视频| 成年免费a级毛片|